Fritz's Owners Representative Service
We bring structure, clarity, and fairness to the home repair / renovation process. We help clearly define work before identifying and soliciting qualified contractors. Reducing "friction" between requirement and contractors upfront permits apples to apples proposal comparisons. This value-add service documents scope, mutual expectations, and agreed-upon performance milestones to facilitate project completion / payments. We respect the contractor’s business. Contractors retain control of their pricing, estimating methods, trade knowledge, and construction techniques. Proposals are treated confidentially and fairly. Homeowner's responsibilities include: accurate project information, ability to pay, and prompt reasonable decisions. The goal is simple: reduce friction between parties. Fewer misunderstandings, better-informed decisions, less conflict, and a smoother project for both homeowners and contractors. Think of Owner’s Representative as an experienced, independent project manager sitting on the homeowner’s side of the table helping organize the process without getting in the way of professionals doing the work.
Broken Garage Door
Client unsure, inexperience, and tight budget.
Shower Floor Tile
Remove and replace broken shower floor tile & grout
Your home fix bugaboo
That one small project fix that bugs you incessantly


EXAMPLE: Shower Floor Tile and Grout Remove and Replace (Chagrin Falls)
-
Protect the surrounding bathroom finishes, adjacent wall tiles, curb, and existing shower drain assembly prior to commencement of work.
-
Carefully demolish and remove existing 25 sq ft shower floor mosaic tile and mortar setting bed down to the underlying waterproofing/pan base, taking caution not to damage the existing curb or perimeter wall tiles.
-
Clean, scrape, and remove all remaining thinset, loose debris, and dust from the 25 sq ft shower pan surface and haul away demolition debris.
-
Inspect the existing drain body and surrounding pan area to ensure clean integration, keeping the existing drain assembly intact.
-
Apply appropriate polymer-modified thinset mortar bed pitched properly toward the central drain to maintain proper drainage slope.
-
Install approximately 25 sq ft of new porcelain floor tile over the prepared shower base, cutting precisely around the perimeter edges, curb transitions, and the circular center drain.
-
Allow mortar to cure, then mix and apply high-performance grout across all tile joints over the 25 sq ft shower floor, ensuring all grout lines are fully packed and uniform.
-
Clean tile faces with a sponge to eliminate haze, and apply matching 100 percent silicone sealant along the entire floor-to-wall and floor-to-curb perimeter expansion joints.
-
Reinstall and securely fasten the existing shower drain cover.
DONE / FERTIG / TERMINADO / FAIT
Let's align to determine mutual fit.
Privacy safeguarded. Solutions offered.
Upcoming Events
- Owner's Representative (Fritz)Wed, Sep 30Webinar / Online Event only
- Owner's Representative Overview (Fritz)Thu, Sep 03https://www.eventbrite.com/e/1998552137242?
Fixed Nominal Pricing
(Money back guarantee* and discounts for new customers (see below*))
20 min
50 US dollars15 min
25 US dollars15 min
37.50 US dollars1 hr 30 min
300 US dollars
Contact Us
Address
4807 Rockside Road Suite 405
Independence, Ohio 44067
Contact
(440) 799-3111
Opening Hours
Mon - Sat
8:00 am – 6:00 pm
Sunday
Closed

50% Off






